Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller

Product Details
Customization: Available
After-sales Service: 24 Hours One Line
Warranty: One Year
Gold Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (16)
  • Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller
  • Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller
  • Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller
  • Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller
  • Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller
  • Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller
Find Similar Products

Basic Info.

Structure
Conveyor System
Material
Iron
Material Feature
Oil Resistant, Heat Resistant, Fire Resistant
Application
Chemical Industry, Grain Transport, Mining Transport, Power Plant
Condition
New
Can Be Customized
Customizable
Adjustable or Not
Adjustable
Transport Package
Sea Transport
Specification
100cm*100cm
Trademark
zhongang
Origin
Chain
HS Code
8428320000
Production Capacity
50 Machine One Year

Product Description

Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller
Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller
Belt conveyor is the most important bulk material conveying and handling equipment, can be widely used in mining,

metallurgy, building materials, chemical industry, electricity, food processing and other industrial fields, in coal

mines, metal mines, iron and steel enterprises, ports, cement plants and other places can see a large number of

applications of leather machine, transport machinery can not only complete the delivery of bulk materials, but also

to transport into pieces of material

 

Main technical parameters of belt conveyor

Tape width (mm) Delivery length (m)
Power (kw)
Delivery speed (m/s) Throughput (t/h)
500 ≤12
3
20-30
4-5.5
20-30
5.5-7.5
650 ≤12
4
12-30
5.5
20-30
7.5-11
800 ≤6
4
6-15
5.5
15-30
7.5-15
1000 ≤10
5.5
10-20
7.5-11
20-40
11-12
1200 ≤10
7.5
10-20
11
20-40
15-30








Belt conveyor is mainly composed of frame, conveyor belt, belt roller, tensioning device, transmission

device, etc


Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller
Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller

Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller



Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller

Product display

Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller


Operation and debugging

1, the fixed conveyor should be installed on a fixed basis according to the specified installation method. Before the mobile conveyor is officially run, the wheels should be wedged with triangular wood or braked with brakes. In order to avoid walking during the work, when there are multiple conveyors working in parallel, there should be a one-meter channel between the machine and the machine and the wall.
2. Before the conveyor is used, check whether the operating parts, tape buckle and bearing device are normal, and whether the protective equipment is complete. The tightness of the tape must be adjusted to the appropriate degree before starting.
3, the belt conveyor should be no-load start. Wait for normal operation before feeding. No feeding before driving. 4. When several conveyors run in series, they should start from the unloading end and start in sequence. After all the normal operation, can feed.
5, in the operation of the tape deviation phenomenon, should be stopped and adjusted, not forced to use, so as not to wear the edge and increase the load.
6, the working environment and the temperature of the material to be sent shall not be higher than 50ºC and lower than -10ºC. Materials with acid and alkaline oils and organic solvents shall not be transported.
7. No pedestrians or passengers are allowed on the conveyor belt.
8, before stopping, you must stop feeding, and so on the belt to discharge the material before stopping.
9, conveyor motor must be well insulated. Mobile conveyor cable do not pull and drag. The motor must be grounded reliably.
10. It is strictly prohibited to pull the belt by hand when the belt slips, so as to avoid accidents.

Cause of deviation

During use, if there is deviation, the following checks should be made to determine the cause and make adjustments. Conveyor belt deviation often check the parts and treatment methods are:

(1) Check the non-coincidence degree between the transverse center line of the roller and the longitudinal center line of the belt conveyor. If the non-coincidence value exceeds 3mm, it should be adjusted by using the long mounting holes on both sides of the idler set. The specific method is to which side of the conveyor belt, which side of the roller set moves forward in the direction of the conveyor belt, or the other side moves back.
(2) Check the deviation value of the two planes of the head and tail frame mounting bearing seats. If the deviation between the two planes is greater than 1mm, the two planes should be adjusted in the same plane. The adjustment method of the head drum is: if the conveyor belt runs off to the right side of the drum, the bearing seat on the right side of the drum should move forward or the left bearing seat should move back; If the conveyor belt deviates to the left side of the drum, the bearing seat on the left side of the drum should be moved forward or the right bearing seat should be moved back. The adjustment method of the tail drum is exactly the opposite of the head drum.
(3) Check the position of the material on the conveyor belt. The material is not centered on the cross section of the conveyor belt, which will cause the conveyor belt to run off. If the material goes to the right, the belt goes to the left, and vice versa. When used, the material should be centered as much as possible. In order to reduce or avoid such conveyor belt deviation, the baffle plate can be added to change the direction and position of the material. 

Transport system maintenance brief

In order to prevent failure, the maintenance and random inspection of the conveyor chain are indispensable:

1. Give lubricating oil regularly;
2. Determination of chain elongation (determination of the total elongation of the tension part, judgment of the total length and elongation of the chain, determination of pitch);
3, spot check roller and track wear, deformation.


Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller

Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller

Power Plant Overhead Conveying System/Belt Conveying System/Conveyor/Conveyor Frame/Drive Drum/Steel Roller

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier